Packington Street in Geelong - vehicles moving and parked along the street; shops and trees on the side; powerlines and blue sky above

Pakington Street North Precinct Urban Design Framework

Ariel view of a house under construction. Timber frame and building materials are visible

Big Housing Build Benalla West Master Plan

Two men, one with a guide dog, waiting to board the train

X’Trapolis 2.0 Mock-up Engagement

Swans swimming at Sanctuary Lakes

Waterfront Building Redevelopment Project

Central Pier, Docklands

Central Pier and Waterfront Revitalisation

Fast-tracking Neighbourhood Batteries Project

A train destined for Flinders Street arrives at a station

Level Crossing Removal Project

Great Tasting Water

Engagement Data Analysis and Reporting Support

A car driving through the Melbourne CBD

Zero Emissions Vehicles Community Panel

Revitalising Yan Yean Reservoir

Melbourne train arriving at the platform

Level Crossing Removals

Aerial view of plane sitting on the tarmac

Third Runway and Master Plan Engagement

A bus travelling down a Melbourne street

Sunshine Transport Precinct Engagement Strategy

Anstey train station in Brunswick

Merri-bek Integrated Transport Strategy